Rogz Bungee Control Long Dog Lead in Pink

    2 (1 reviews)
    Sale

    The Rogz Control Long Dog Lead in Pink smooths out lurches when you want comfort and tightens up when you need precision. Activate the shock-absorbing section for reactive moments or lock it out for steady heeling. Reflective details, a secure SnapLoc hook and a handy bag holder round out an easy daily setup.

    • Clip
    • Reflective
    • Nylon
    • Solid
    • Walking and Recall

    Product Details

    1. Suitable For Dogs With Gentle To Strong Pull Behaviour
    2. Use Stretch For Everyday Comfort And ShocLoc For Traffic Or Training
    3. Attach To A Well Fitted Collar Or Harness
    4. Not For Tie-Out Or Cycling
    5. Surface Clean With A Damp Cloth And Air Dry
    6. Store Dry And Away From Heat
    7. Inspect Webbing Stitching And Hardware Regularly And Replace If Worn Or Damaged

    Here to help demystify pet care

    Reviews

    free next day delivery on orders over $79